Principal Investigator for Rotorcraft Lean Manufacturing, Methods and Standards and Methods/Ergonomic Improvements at Corpus Christi Army Depot. Utilized videotape technologies to analyze processes, develop CAT II standards, and document methods improvements with a cost/benefit analysis for each recommended improvement with training. CAT II Methods and Standards tool produces time standards in 2 hours versus 10 hours by government staff. Over the last 16 months of the contract, the team achieved $28.5M in Cost Avoidance Recommendations/Initiatives ($1.78M/month), 507.9 days in Turnaround Time Reduction (35.7 days/month), and 4,450 Standard Hours Developed (278 hours/month).