Material Testing Technology
Program Manager for $300K Material Testing Technology project for UH-1 (Huey) and UH-60 (Blackhawk) helicopters. Project outcomes resulted in reduced test flights through blade matching, cabin absorber
Repair Maintenance Level Probabilities Stochastic Modeling
The U.S. Army does not have a valid way of calculating Administrative Logistics Downtime (ALDT). This project was initiated to statistically determine a more efficient and accurate method
Quality & Reliability Engineering Program
Program consisted of fifteen months of classroom study involving a Quality and Reliability Engineering curriculum at the School of Engineering and Logistics during which 36 hours of graduate credit was obtained